           Depending upon the level, location, use and extent of remediation required, the remediation needs to be done with appropriate levels of protection. Persons handling materials, contents and debris from a mold remediation are exposed to elevated mold levels. Mold can spread just as when you blew on the dandelion that turned white and saw the tiny seeds go everywhere. PPE or “Personal Protective Equipment” needs worn by those exposed to airborne mold during work.


           At a minimum, workers need protected with masks. In higher mold conditions or closed areas, gloves and suits may also be crucial and necessary protective equipment.

 

            If an area of remediation has disturbed materials, the area being cleaned needs contained from spreading disturbed mold through other areas of the building envelope. Contaminated materials need to be wrapped and carried out of the building while enclosed or wrapped to prevent mold contaminated materials from harming others.

 

           In areas of significant disturbed mold contaminated materials, the area of work may need protected with an airlock. This is usually simple, overlapping plastic doors that appear like the scene you may remember from the movie "ET the Extraterrestrial. This is called containment.

 

           In situations where there is concern and risk that disturbed mold may be drawn from the disturbed area into the other areas of the building, the work area needs placed under negative air pressure. That means the air is drawn from that area and sent to the exterior.

 

           Forced air heating systems are another place that needs professionally considered to avoid moving mold through the rest of the building. Ductwork may need sealed within work areas to avoid the furnace or AC blower pushing mold through the building while the unit is operating.

 

           Another aspect of the professional mold remediation job is air scrubbing.  Mold spores go into the air. That process is accelerated when mold is disturbed during work.  As that mold is floating in the work area can be collected onto a filter in the piece of equipment called an air scrubber. This is a highly efficient air filter designed to capture the small particles such as mold.

 

Post Remediation Verification Testing at the End of Remediation
           
          At the end of the work, you should have proof that the work was effective in removing the mold. This is done by conducting a "clearance test" also known as a PRV, short for "Post-Remediation Verification" Accepted procedure is that clearance testing should not be conducted by the remediator.to avoid the “fox counting the chickens in the chicken coup.”

 

            Selecting the right professional for your project can be a scary challenge. It is a very important task with the health of occupants of the mold contaminated building depending upon the work of possibly unknown strangers.

 

For links and additional information about finding help for mold remediation, go to: www.Envirospect.com/FailedRemmediation

Posted by Dan Howard on April 14th, 2020 6:46 PM

            The sad truth is that many mold remediation jobs fail and leave the customer with an empty wallet and a home that is still unhealthy. Mold has often grown back within weeks or months of a treatment. The mold remediators that do not do a good job count on several factors.


             It is shocking to find that after thousands of dollars of treatment many homes still have mold visible in areas such as behind baseboards, behind walls, in ductwork and on contents that were not treated. Those remediators are counting on the customer not recognizing the remaining mold.

What the Bad Mold Remediators Want you to Believe

              We all pretty much trust the claims on the label of Lysol Disinfectant Spray. In bold letters is says that  it has a 99.9% kill rate for germs, bacteria and mold. Heck, they wouldn’t make a false claim, would they?
 

              Picture that we go into a dirty, dusty room and spray everything with a mist of Lysol. Fast forward two weeks. The dust, dirt and other debris is still there. Maybe we even add a little food debris on the kitchen counter and table.

             Do you for one minute believe that any home will be germ free three weeks after being sprayed? Simply spraying or fogging with a mold product is not enough to make a home or any other building an acceptable level of mold for more than a few days or weeks.

It’s the Preparation That Makes the Difference

             The most economical and healthy approach to mold remediation in a building is to complete remediation of all mold contaminated areas and sources of contamination in the initial project. An independent expert in the building science of mold should do an assessment for two reasons. One reason is the added expertise in finding mold and creating the plan to keep it from coming back. The other is that it will provide a customer the information to know which mold remediators proposal is right for the property. You want enough work done to make sure the property stays mold free and mot more work or expense than is necessary.         

Selecting a Remediator and Treatment System

            Identifying and removing materials and contents that can’t be cleaned is the first step. Deep cleaning of organic debris and dust is critical to success. HEPA cleaning, wiping and disinfection of surfaces is required for most remediations to be successful and lasting. Do not settle for spraying or fogging without preparation.     


            There are numerous mold treatment systems available that encompass a wide range of chemicals of varying toxicity. Some chemicals that have superb effectiveness are very dangerous to health and safety. The goal is selecting a treatment system that can fully kill mold and yet be safe for residents and mold technicians. The additional important criteria are that the residual chemical should have a degree of continued effectiveness and yet be safe for occupant and pet exposure.

  

           Make sure that product label instructions are followed. The use of an enzyme-based treatment system is often a great choice. In any instance, the chosen treatment system should be applied according to directions by technicians utilizing proper procedures and personal protective equipment. All systems of mold treatment include application of chemical products that should be done by trained professionals to assure both safety and effectiveness.  

           Indoor air humidity and to be less than 40% to 50 %, and all cavities and surfaces free of wetness. All water leaks and events need corrected. The conditions that allow mold growth must be avoided.



Posted by Dan Howard on April 14th, 2020 6:42 PM

“Trust but Verify” After the Remediation

               At the end of the work, you should have proof that the work was effective in removing the mold. This is done by conducting a "clearance test" also known as a PRV, short for "Post-Remediation Verification."

The remediation firm should not conduct their own PRV They have the obvious temptation to “pass” the job when it should fail. They want paid for the work and do not want to say they did a bad job. Even the very best firms can fail a clearance because of an oversight or hidden mold source.  Clients need an independent Post Remediation Verification test for several reasons. We can’t see mold spores, there can be multiple sources of contamination or an ineffective treatment. Mold can hide in areas we can’t see.

Back to earlier today, and the remediator that has ignored the basic principles of remediation. Four times he did not clean visible mold and the dirt and debris that holds mold. Four times he didn’t correct the obvious water leaks creating more mold. The remediation contractor in today’s story is a pleasant person, and I believe meant well and wanted to succeed. He just lacked the discipline and experience to do the job correctly.

The lesson is that it is critical to have a PRV or Post Remediation Verification test after a mold remediation.   

Posted in:mold remediation and tagged: PRVClearance
Posted by Dan Howard on June 1st, 2018 9:05 PM

Imagine you are a professional mold remediator. You know that the goal you are pursuing is to correct the nasty mold levels. You should also make corrections so that the mold doesn’t return. The customer is paying you thousands of dollars to achieve those goals. Hanging in the balance is the health of the family living in the home.

                Now that you have a vivid picture of the importance of a proper mold remediation in your mind, let me tell you about my experience as an environmental consultant earlier today. Today is the fourth time this professionally remediated home has failed clearance. Each previous time it failed, I have spoken with the remediator about ways that his company can properly remediate the home. Each time, he has ignored the advice. I truly want this job done correctly and the family living in the home o enjoy a healthy home forever more.   

Mold After Remediation

Mold Remediation 101

Choosing Remediation Systems and Reliable Professionals: There are many mold treatment systems available that encompass a wide range of chemicals of varying toxicity. Some of the chemicals that have superb effectiveness are very dangerous to health and safety. Others require precise attention to detail. The goal is to select best treatment system for a project that will fully remove or kill mold in a safe environment for workers and occupants of a building.  

 

Treatment Systems for Chemically Sensitive Individuals: In the case of mold or chemically sensitive individuals, we highly recommend exposure to a sample of treatment products before a system or chemicals are used in their property. This can easily be accomplished by provision of a sample cloth treated with a product and given to the sensitive occupant prior to remediation treatment. They should also have “test” exposure to any building material or product brought into a building. Even reaction to a common product such as caulking can create problems for chemically sensitive individuals.   

 

Preparation for Remediation: Remediation systems require proper preparation and conditions for the treatment system to be effective. One example is that the building should be less than 40% to 50 % relative humidity. Another example is that mold and biological debris should be removed before treatment. Moldy contents need addressed with treatment or removal from the site.  All water leaks and events need corrected and promptly addressed and resolved. We need to avoid the types of surfaces and materials that may be a substrate for mold growth.


Protecting the Occupants and Workers:  Depending upon the level, location, use and extent of remediation required, the remediation needs to be done with appropriate levels of protection for the premises, occupants and workers. Persons handling building materials, contents and debris contaminated by mold are exposed to elevated mold levels. This is because the disturbed mold spreads in the same way as when you blew on the dandelion that turned white.  As kids, we were amazed as the tiny seeds went everywhere. If you are like me, you never gave a thought to the fact we were spreading dandelion seeds. We know better now. PPE or “Personal Protective Equipment” needs to be worn by those exposed to airborne mold during work.

 

At a minimum, workers need protected with masks. In higher mold conditions or closed areas, gloves and suits may also be crucial and necessary protective equipment.

 

Stopping the Spread of Mold During Remediation:  If an area of remediation has disturbed materials, the area being cleaned needs first contained from spreading disturbed mold through other areas of the building envelope. Contaminated materials need to be wrapped and carried out of the building while enclosed or wrapped so as not to allow the mold contaminated materials to harm others.

In areas of significant disturbed mold contaminated materials, the area of work may need protected with an airlock, usually simple, overlapping plastic doors that appear like the scene you may remember from the movie "ET the Extraterrestrial. This is called containment. 

Exhausting Mold Spores Outdoors: In situations where there is concern and risk that disturbed mold may be drawn from the disturbed area into the other areas of the building, the work area needs placed under a negative pressure. That means the air is drawn from that area and sent to the exterior. Furnace ductwork may need sealed within work areas to avoid the furnace or AC blower pushing mold through the building while the unit is operating. The process of establishment of a negative air flow away from the non-contaminated areas is called negative air.

Filtering the Mold Floating in the Air: Another aspect of the professional mold remediation job is air scrubbing.  Disturbed mold spores go into the air. The mold floating in the work area can be collected onto a filter in the piece of equipment called and air scrubber. This is a highly efficient air filter designed to capture the small particles such as mold.

Drying out the Building: Dehumidification to a low moisture level is required for effective mold remediation. Portable commercial dehumidifiers are often used for that purpose.

Posted by Dan Howard on May 26th, 2018 10:45 AM